Residential

 
1-Phase: Electric System Charge $47.00
3-Phase: Electric System Charge $52.00
All kWh $0.0897
Commercial - w/o kW  
1-Phase: Electric System Charge $47.90
Energy (kWh) $0.0588
3-Phase: Electric System Charge $52.10
Energy (kWh) $0.0673
Commercial - w/ kW  
Distribution: Electric System Charge $115.30
Availability (kW) $6.02
Administrative (kWh) $0.0008
Power: Demand (kW) $2.09
Energy (kWh) $0.0268
LP1 - 101-1000 kVa  
Distribution: Electric System Charge $172.00
Availability (kW) $4.66
Administrative (kWh) $0.0019
Power: Demand (kW) $2.04
Energy (kWh) $0.0350
LP2- > 1000 kVa  
Distribution: Electric System Charge $387.00
Availability (kW) $4.86
Administrative (kWh) $0.0018
Power: Demand (kW) $2.16
Energy (kWh) $0.0382
New Large Single Load  
Distribution: Electric System Charge $396.00
Availability (kW) $5.17
Administrative (kWh) $0.0016
Power: Demand (kW) $2.89
Energy (kWh) $0.0428
Area Lights  
100W $13.81
200W $25.25
400W $41.03

Blachly-Lane Electric Co-op
Residential Electric Rates - 2017

Blachly-Lane’s Board of Directors has approved new rates effective January 1, 2017 and will be reflected in the February 2017 bill. The rates reflect the cost of providing service to each customer class determined in a recent cost of service analysis. The residential electric system charge has increased to $47. The residential kWh charge has been increased to $0.0897. The overall impact to residential members is a 6.9% increase in rates.

Increases or decreases for individuals within a customer class vary by usage and other billing factors.

Blachly-Lane takes rate decisions seriously.  We know that rate changes effect members in a very personal way. The Board of Directors have committed to making sure the co-op maintains safe and reliable service, is responsive to members’ needs and remains financially fit. 

Rates effective 1/1/2017 and will be reflected in the February 5, 2017 bill.

 

 

 

 

 

 

Individual Rate Schedule Information

Residential (R-GS 2017)
Commercial (C1-2017)
Commercial (C2-2017)
Large Power 1 (LP-1 2017)
Large Power 2 (LP-2 2017)
New Large Single Load (NLSL-2017)
Area Lights (AL-2013)
Green Power (GP-2011)
Wheeling Rate (WR-2013)
Avoided Costs (AC-2017)

 

 

 

 

 

 

 

 

Powered by Touchstone Energy Cooperatives Logo
Coop Connections Card Image and Link 811 Image and Link Member Portal Login button